| 6 January, 2001 |
|

Click on the image to see it full size (50K).
More rough cabinet work continues.
Here we see some of the lower cabinets in the kitchen.
The opening on the right is for the stove.
The opening on the left is for the dishwasher.
|
| 10 January, 2001 |
|

Click on the image to see it full size (68K).
Cabinet work continues in the kitchen.
Here we see that upper cabinets are being added.

Click on the image to see it full size (58K).
Marsha discusses some design details for
the cabinets surrounding the stove with Philip Garcia (general contractor).
|
| 13 January, 2001 |
|

Click on the image to see it full size (67K).
Cabinet work continues in the kitchen.
Here we can see the first drawer box has been built and installed.
|
| 24 January, 2001 |
|

Click on the image to see it full size (52K).
Cabinet work continues in the kitchen.
The base for the island is being formed.
The island will contain an ice machine on the near end, and a second sink on the far end.

Click on the image to see it full size (60K).
Other trim work is progressing nicely.
Bead board wains coating is being applied to the walls in the master bath, as seen in this view of the powder
room.
|
| 31 January, 2001 |
|

Click on the image to see it full size (108K).
The exterior surfaces are being prepared for paint.
The ceilings under the porches will soon be painted a light shade of blue so that nesting creatures are
discouraged from becoming close neighbors.
|