These are the significant events in the construction of the Double Luck Garage during February, 2001.

3 February, 2001

Wains coating installed
Click on the image to see it full size (72K).

A wainscoating of bead board is being installed. It will not be much longer until the BBQ grill is moved out of the Garage, and into its permanent location.

7 February, 2001

Door and window trim
Click on the image to see it full size (75K).

The wainscoating of bead board has been installed, although a trim piece across the top is missing from this one wall. The windows, doors, and other openings have been trimmed using the same rustic treatment as is being done elsewhere.

Garage door window dividers
Click on the image to see it full size (96K).

The dividers have been inserted into the windows on the main door.

Bypass Construction History August, 2000 September, 2000 October, 2000 November, 2000 December, 2000 January, 2001 February, 2001 March, 2001 April, 2001 May, 2001 June, 2001 July, 2001
Friendly Garage Construction Submenu
Web Site Menu Contact webmaster Prior page Next page
URL: http://doubleluck.com/places/garage/const0102.php
Last modified: Wed, 27 May 2009 13:22:57 -0600
Copyright © 1999-2010 Larry Bristol - All rights reserved.